If You Work in an Area Where These Are Present: Then Use This Type of Forklift. Hazard Classification Acceptable Forklift Designations Class I Flammable gases or vapors are or may be present in quantities sufficient for explosion or ignition Division I Condition...
Blog
Electrical Terms & Definitions
TERMS & DEFINITIONS Electricity - The movement of electrons from a location of a greater number (positive) of electrons to a location of lesser number (negative) of electrons. Positive - A location of the greater number of electrons. Negative - A location of...
Electrical for Events
TERMS Volts - The common name for measuring the energy level in a circuit or conductor or the rating of the energy required by a device. Amps - The common name for the measurement of the current in a conductor, the amount or current a device requires or the maximum...
Cut-Off Saw Starting Tips
Cold Engine Starting Procedure Toggle the ignition switch to the "ON" position and pull the choke lever out. Lock the throttle in the start position by depressing the trigger (A) and trigger interlock (B) at the same time. Depress and hold throttle lock button (C)...
Cut-Off Saw Cutting Tips
ICS Blount Making your first cut Outline the cut with a permanent marker. Start the saw and after a brief warm-up period, rev and hold the trigger on full throttle. Always use full throttle when cutting. Carefully align the nose of the bar with the cut line, slowly...
Construction Heater Safety (150,000 BTU/HR)
FOR USE WITH PROPANE GAS ONLY Max. gas supply pressure: Bottle pressure Min. gas supply pressure: 5 PSIG Manifold Pressure: 10 in. W.C. Burner Port (Orifice) Size: 1.00 MM Drill - 18 Holes Electrical input: 115v, 60 hz, 4a Minimum Voltage: 100v WARNING: IMPROPER USE...